The Common Effluent Treatment Plant in this cluster is managed by SIPCOT & SIDCO Phase II Entrepreneur Finished Leather Effluent Treatment Company Pvt. Ltd., in short SIDCO-II CETP, a company promoted by 40 tanners who are its members. This company is managed by a BoD, drawn from its members. Mr. R. Srinivasaraghavan, a tanner of the area, is currently the Managing Director of the company.
The turnkey implementation of the project was awarded to Hyderabad based Ramky Infrastructure Ltd based on a two stage competitive tendering. The contract value was Rs. 16.5 crores and the total project cost including administrative charges was Rs. 17.3 Crores.
The project had been completed in March 2013. The plant has been in continuous operation since March 2013. This upgraded plant had been formally handed over to CETP and contractor for O&M in October 2014.
Post handing over, some supplementary activities were also taken up in the CETP which included an additional mixer in equalization tank, the second filter press and new RO membranes.
In 2018, SIDCO-II CETP had submitted a proposal to DPIIT for upgradation of the ZLD system and reduction of O&M cost under the IFLADP Scheme. The following components were approved with 70% funding by DPIIT and balance to be equally shared by the Industries Department of the Government of Tamil Nadu and the beneficiary CETP.
# | Name of the item as per the DPIIT sanction | Sanctioned cost | Physical status of each component in % |
---|---|---|---|
B2 | Modification in raw effluent collection system to pumping line | 130.30 | - |
D5 | Improvements in Primary Treatment Units Mechanical screen Improvement of primary clarifier |
20.54 | 70% |
D6 | Modification in Secondary Treatment Effluent storage tank Handrails in SS New surface aerators |
128.86 | 95% |
D7 | Tertiary Treatment units Oxidation system |
180.00 | 45% |
D8 | Filter Press (4 Ton/day) | 67.03 | 30% |
E10 | Installation of Two stage RO Plant 400 m3 / day and HPRO 350 m3/ day | 262.78 | 100% |
F11 & 12 | MEE with all accessories 220 m3/day with ATFD, Centrifuge & Jetting machine 1200 bar, 75HP for evaporator cleaning | 768.40 | 70% |
H16 | Installation of new DG Set (250 KVA) | 34.77 | 100% |
H14 | Up gradation of laboratory and Safety equipment | 13.48 | 100% |
G13 | Solar Power (1MW) | 450.00 | 70% |
Project total | 2056.16 |